Data Center Surface Specialists
The floor
gleams.
The racks
keep running.
Epoxy and antimicrobial coatings across raised-floor environments — executed in overnight shifts while your infrastructure stays live. Zero downtime. Zero dust migration. Audit-ready documentation.
Total SF Coated
4.2Msq ft
across 38 facilities, 2019–2026
Downtime Events
0
zero infrastructure interruptions on record
Audit Pass Rate
100%
Uptime Institute & SOC 2 compliant
Project Record
38 facilities.
Every one still running.
Each entry below is a completed project. Click any card to expand the full scope — problem photograph, coatings spec sheet, execution details, and documented outcome. Scroll through in order: they get more complex as you go.

Tier III Colocation
Equinix DA11
Dallas, TX
Square Ft
62,400
Duration
11 nights
Shift
Midnight – 06:00
The Problem
Peeling deck paint generating particulate under raised floor. Audit flag from Uptime Institute inspection. Client had 8 weeks to remediate.

Scope of Work
Full raised-floor epoxy recoat across three data halls + MPOE room antimicrobial treatment
Coatings Used
Tnemec Series 280 Tneme-Glaze
Sherwin-Williams ArmorSeal 1000HS
PPG Amercoat 370
Execution
62,400 sq ft
11 nights
Midnight – 06:00

Enterprise Hyperscale
Fortune 50 Private Cloud
Northern Virginia
Square Ft
218,000
Duration
34 nights
Shift
Phased: 23:00 – 07:00
The Problem
Client inherited building from prior tenant. 14-year-old floor coating failing across all halls. SOC 2 Type II renewal at risk due to contamination control findings.

Scope of Work
Full-building recoat across 9 halls, stairwells, and mechanical corridors. Antimicrobial wall treatment on all server room perimeters.
Coatings Used
PPG Amerlock 400
Tnemec Series 66 Hi-Build Epoxoline II
Sherwin-Williams Macropoxy 646
Execution
218,000 sq ft
34 nights
Phased: 23:00 – 07:00

Healthcare Critical Infrastructure
Regional Medical Center
Chicago, IL
Square Ft
4,200
Duration
3 nights
Shift
01:00 – 05:30
The Problem
Hospital MPOE room failed infection-control inspection. Coating degradation allowing microbial growth on floor and lower wall sections. JCAHO review in 4 weeks.

Scope of Work
MPOE room and IDF closet antimicrobial coating. Raised-floor epoxy in primary data room. HVAC plenum antimicrobial treatment.
Coatings Used
Sherwin-Williams Sher-Cryl HPA
Tnemec Series 287 Tneme-Glaze UVX
PPG Amercoat 68HS
Execution
4,200 sq ft
3 nights
01:00 – 05:30
Site Photography
0400.
The floor doesn't lie.
How We Work
Live infrastructure.
No excuses.
The difference between a painting contractor and a critical-environment coating crew is protocol. Here's exactly how we execute in a live data hall.
Negative-Pressure Poly Barrier System
Every hall is isolated before a single grinder spins. We deploy full-ceiling poly sheeting secured to raised-floor stringers and cable tray edges, creating a negative-pressure zone drawn by HEPA air handlers positioned at the hall perimeter. Particulate generated during surface prep cannot migrate to adjacent spaces or infiltrate open rack bays.
Air pressure differential is maintained at –0.02 to –0.05 in. w.c. and logged continuously. Containment is inspected at shift start and after every break. Poly is disposed as controlled waste — not cut and left on the floor.
Pressure Differential
–0.03 in. w.c.
Air Changes
12 ACH (HEPA filtered)
Containment Log
Every 30 min, timestamped

Compliance & Partners
Your auditor asks.
We've already answered.
Coating Manufacturer Partnerships
Sherwin-Williams
Protective & Marine Coatings
PPG
Protective Coatings Division
Tnemec Company
High-Performance Coatings
Uptime Institute
M&O Stamp Documentation Ready
Project documentation packages structured to satisfy Uptime Institute Management & Operations Stamp requirements. Delivered indexed and audit-ready.
SOC 2 Type II
Evidence Package Included
Chain-of-custody documentation, air quality logs, and surface preparation records formatted as SOC 2 audit evidence. No follow-up requests from auditors.
JCAHO
Healthcare Environment Compliant
Zero-HAP coating specifications and infection-control containment protocols for MPOE rooms and IDF closets in healthcare settings.
OSHA 1910.1000
Air Contaminant Standards
Continuous PID monitoring ensures all VOC levels remain below OSHA PELs throughout application and cure. Records provided.
Audit Deadline Approaching?
Six weeks is enough time.
If you call today.
No form here — clicks through to a 5-question intake
Scope Request
Your audit window
is closing.
Tell us your facility type, square footage, whether the environment is live, and your maintenance window. We'll have a scope back to you within 24 hours.